Survey Results

The current results of our When will you go into production with 9.0? survey are:

Answer Responses Percentage
We're already running 9.0 35 12.915129151291513%
As soon as we finish the QA testing 63 23.247232472324722%
After 9.0.1 comes out 79 29.15129151291513%
Maybe in six months or a year 82 30.25830258302583%
We're stuck on 8.3 until it EOLs 12 4.428044280442805%
Total 271

This survey was posted 2010-09-24.

Other Surveys